Building Information Modeling (BIM); a model for improving the design process

Authors
1 Faculty member (Associate Professor) of Imam Khomeini International University, Qazvin, Iran,
2 Faculty member, University of Tehran,
3 PhD Student / Imam Khomeini International University
Abstract
Already in a variety of buildings with different uses, what would seem more architectural design, the changes after utilization by users that this change in terms of non-compliance with design requirements and not due to changes in other aspects, such as engineering and pre-operation. Sometimes encountered with a sudden change in the design process and according to the traditional structure of the design process, this change does not apply in other dimensions and design errors during the operation, to show the changes will be binding, it could be next a model to follow design changes and pre-operation would lead to elimination; as necessary. Building Information Modeling (BIM) by removing complexity in the design, manufacturing, integration of information with possible changes in the other components of the structure, anticipate and reduce errors after the operation and construction. With technology development, process improvement and change the industry has improved, but still compact construction industry based on the traditional process, with the architectural design or building design, constructed by contractors. This is while, the building of new systems and due to the changing demands of the employer, are very complex, so that we add to this complexity, architects, owners and contractors to align themselves with these developments, in the wake of Operation changes into the design drawn on the body, it's important to be consistent and comprehensiveness of information between other elements of building construction creates a problem, since more of the architect's plans need to be integrated and followed this interference with the program at all stages make a pre-operation. In fact, building information modeling, a new change in the design and construction industry is documenting, modeling, building information, information about the whole building gives us the full documentation and integration into a database gives us. All of these parameters are therefore connected to each other, any change in the model of an object, the entire project will affect all aspects, building information modeling, data includes actual building is only two-dimensional maps, which are common Maps drawn with CAD found not formed. Building Information Modeling, a common mistake is called as a digital model generated by CAD software in a process known as Building Information Modeling. Construction industry due to the large number of documents it is much more complicated than ever. BIM new promising tool in architecture, engineering and construction industry, which will build a virtual model before the actual construction of buildings on the main field allows information. In fact, this model designs because this method, using the building information and it is also the most important stage design. Building and weaknesses through analysis software is documented. In enhancing the effectiveness of the do the right thing, in this method, two-dimensional plan was rejected and assessments in specific applications with methods to identify the areas and their dimensions are considered qualities, at different times of exposure, etc. is checked.

In the construction of a project, including design partnership with the consultancy, construction and post-run (after the operation) is, in fact semantic knowledge building must be provided, building information model, common architecture Other aspects of the project such as building provides structural and semantic knowledge, based on continuous improvement approach, which supports the evolutionary changes simply and recovery. It improves with time-saving schematic design, design changes and development, creation and coordination between the various elements of project design and control documents in advance of the operation increases productivity. The main objective of this study was to develop methods to improve the architectural design stage before an exploit is in fact to determine the effectiveness promoter factors, using the building information model, the final design is done. The rise of the more complex, faster and build sustainable development in the form of improved technology makes BIM drawing because the traditional activities are not able to meet these pressures. It is hoped that with the widespread use of building information modeling in the field of construction, the cost of future performance and reduced use and improved performance of the operation to reduce errors. The Building Information Modeling as an innovative way to design, construction of process before and after the operation, implementation and management, compared with more traditional methods of design and attitude as human activities that model, instead of seeing it as an object-oriented approach or a special software. In fact, BIM improves the automation industry and process two-dimensional animation project, has been integrated into the workflow in the batch process, the ability of computing, networking and data information and knowledge society maximized and errors are reduced.

Building Information Modeling (BIM) by removing complexity in the design, manufacturing, integration of information with possible changes in the other components of the structure, anticipate and reduce errors after the operation and construction. With technology development, process improvement and change the industry has improved, but still compact construction industry based on the traditional process, with the architectural design or building design, constructed by contractors. This is while, the building of new systems and due to the changing demands of the employer, are very complex, so that we add to this complexity, architects, owners and contractors to align themselves with these developments, in the wake of Operation changes into the design drawn on the body, it's important to be consistent and comprehensiveness of information between other elements of building construction creates a problem, since more of the architect's plans need to be integrated and followed this interference with the program at all stages make a pre-operation. In fact, building information modeling, a new change in the design and construction industry is documenting, modeling, building information, information about the whole building gives us the full documentation and integration into a database gives us. All of these parameters are therefore connected to each other, any change in the model of an object, the entire project will affect all aspects, building information modeling, data includes actual building is only two-dimensional maps, which are common Maps drawn with CAD found not formed. Building Information Modeling, a common mistake is called as a digital model generated by CAD software in a process known as Building Information Modeling. Construction industry due to the large number of documents it is much more complicated than ever. BIM new promising tool in architecture, engineering and construction industry, which will build a virtual model before the actual construction of buildings on the main field allows information. In fact, this model designs because this method, using the building information and it is also the most important stage design. Building and weaknesses through analysis software is documented. In enhancing the effectiveness of the do the right thing, in this method, two-dimensional plan was rejected and assessments in specific applications with methods to identify the areas and their dimensions are considered qualities, at different times of exposure, etc. is checked. BIM improves the automation industry and process two-dimensional animation project, has been integrated into the workflow in the batch process, the ability of computing, networking and data information and knowledge society maximized and errors are reduced.

Keywords

Subjects


Chougule, N. S & Konnur, B. A, A Review of Building Information Modeling )BIM) for Construction Industry, International Journal of Innovative Research in Advanced Engineering )IJIRAE), )2015), Vol 2, pp. -98 102
Krygiel, E & Nies, B & McDowell, S, Green BIM: Successful Sustainable Design with Building Information Modeling, Translated by Mehdi Rvanshadnya and Mehran Ghanbari motlagh Tehran: Simaye Danesh, )2014)
Mohd-nor, M.F.I, Grant, M .P, building Information Modelling )BIM) in the Malaysian Architecture Industry, )2014), Volume 10, pp.273-264.
Zhang, J& Seet, B.C& Lie, T.T, Building Information Modelling for Smart Built Environments, )2015), PP.115-100, www. mdpi.com/journal/buildings/
Pena, W, Problem seeking: An architectural programming primer )4th ed.). New York: Wiley. ) 2001)
Lang, L, Creating Architectural Theory: The Role of the Behavioral Sciences in Environmental Design, Translation: Alireza eini far, )2007), Tehran University Publications.
Swinberg, H. H, Change is the challenge. AIA journal )1967 ) ,)5), PP.90-83
Maghrebi, M & Waller, T& Sammut, C, Integrated building information modeling )BIM) with supply chain and feed- porward control, YBL jounal of built environment, (2013), Vol. 1 Issue 2, pp. 34-25
Eadie, R & Odeyinka, H& Browne, M & McKeown, C & Yohanis, M, Building Information Modelling Adoption: An Analysis of the Barriers to Implementation, Journal of Engineering and Architecture, ) 2014), Vol. 2, No. 1, pp. 101-77
Kekana,T.G & Aigbavboa, C.O& Thwala, W.D, Building Information Modeling )BIM): Barriers in adoption and implementations strategies in the south Africa construction industry, International Conference on Emerging Trends in Computer and Image Processing )ICETCIP), )2014), Dec. 16-15, Pattaya )Thailand), pp. 111-109
Shen, W., Shen, Q, BIM-Based user pre-occupancy evaluation method for supporting the designer- client communication in design stage. Conference of Management and Innovation for a Sustainable Built Environment, )2011a), -20 23 June. Amsterdam, The Netherlands
Shen, W, BIM- Based user pre-occupancy evaluation platform )PEP) for facilitating designer- client communication in the early design stage. A thesis for the degree of doctor of philosophy. )2011b) The Hong Kong polytechnic university.
Shen, W, Shen, Q, & Sun, Q, Building Information Modeling-based user activity simulation and evaluation method for improving designer-user communications. Journal of Automation in Construction,)21) ,)2012),PP. 160-148.
Eastman, C & Teicholz, P & Sacks, R & Liston, K, BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors, )2014), Translators: Meysam Zekavat and other, Tehran: Jahad Daneshgahi
Gerber, B.B& Rice, Samara, The perceived value of bulding information modeling in the U.S. building industry, Journal of Information Technology in Construction, )2010), Vol. 15. pp. 201-185
Building Smart, International Alliance for Interoperability; Constructing the business case, Building Information Modelling, British Standards Institution, )2010), London.
Mandhar, Manish & Mandhar, Meenakshi, Biming the architecture curricula-integrating building information modeling )BIM) in architecture education, International Journal of architecture )IJA), (2013), Vol. 1, pp. 20-1
Enegbuma, W. I & Dodo, Y. A& Ali, K. N, Building Information Modelling Penetration Factors in Malaysia, International Journal of Advances in Applied Sciences )IJAAS), ) 2014), Vol. 3, No. 1, pp. 56-47
Chandar, P& Dhivya Shree, G, Integrating Building Information Modelling )BIM) and Construction Project Scheduling to Result in 4D Planning for a Construction Project with Relevant Illustrations, International Journal of Emerging Engineering Research and Technology, )2015), Volume 3, Issue 4, PP. 74-67
Morlhon, R& Pellerin , R& Bourgault, M, Defining Building Information Modeling implementation activities based on capability maturity evaluation: a theoretical model, International Journal of Information Systems and Project Management, )2015), Vol. 3, No. 1, PP. 65-51
Kymmell, W, Building information modeling: Planning and managing construction projects with 4D CAD and simulations, (2008), McGraw-Hill, New York
Zahrizan, Z& Mohamed Ali, N& Tarmizi Haron, A& Marshall-Ponting, A& Zuhairi, A, Exploring the Barriers and Driving Factors in Implementing Building Information Modelling )BIM) in the Malaysian Construction Industry: A Preliminary Study, Journal The Institution of Engineers , )2014), Vol. 75, No. 1, Malaysia. PP. 10-1
Vinoth Kumar, J& Mukherjee, M, Scope of Building Information Modeling )BIM) in India, Journal of Engineering Science and Technology Review 2009) 1(2), pp165-169.
Housing Investment Group Co., Recognition and initial assessment technique Building
Information Modeling )BIM); Department of technology development and manufacturing, R & D, )1393); pp. 14-1